Final | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 2/28/2001 12:49:05 PM
|
Final | 2/14/2001 | 2/15/2001 | 2/15/2001 | P | FAIL |
Dave Lightfoot
|
|
|
call first house is locked her name is Karen ###-#### or ###-#### need combustion air 2/15/2001 2:33:21 PM
|
Final | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | FAIL |
Dixie Fellows
|
|
|
FOR HOMEOWNER KAREN ###-#### CALL 1ST BEFORE INSP -FN need comb air and insulate plenum 2/8/2001 9:47:01 AM
|
Final | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 10:27:54. Contact: ###-####.
|