Final | 1/11/2001 | 1/12/2001 | 1/12/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 11:25:33. Contact: ###-####. no occ card on site 1/12/2001 11:07:42 AM
|
Final | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 13:49:52. Contact: ###-####. sign temp occ 12/21/2000 11:13:03 AM
|
Final | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 11:41:15. Contact: ###-####. c/n posted 12/20/2000 12:00:51 PM
|
Rough-in | 11/29/2000 | 11/30/2000 | 11/30/2000 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 15:24:18. Contact: ###-####. ceiling cover in bathroom ok 11/30/2000 9:29:43 AM
|