Pressure Test | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 09:22:38. Contact: ###-####.
|
Pressure Test | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 10:13:26. Contact: ###-####. test through key stop 11/27/2000 3:41:19 PM
|
Pressure Test | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Rob ###-#### sleeve gas pipe at f/p 11/14/2000 3:05:57 PM
|