Final | 1/11/2001 | 1/12/2001 | 1/12/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 23:19:29. Contact: ###-####.
|
Final | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 09:31:22. Contact: ###-####.
|
Final | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-####
|
Pressure Test | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | PASS |
Dixie Fellows
|
|
|
JEFF-- ###-#### PRES TEST-RE-INSP
|
Rough-in | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | PART |
Dixie Fellows
|
|
|
R/I --JEFF ###-#### need 3/4" gas to furn..r/i ok 11/14/2000 1:24:49 PM
|