Final | 1/16/2001 | 1/16/2001 | 1/16/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 09:04:06. Contact: ###-####. BLC on lockbox
|
Pressure Test | 11/22/2000 | 11/22/2000 | 11/22/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 09:01:03. Contact: ###-####.
|
Rough-in | 11/22/2000 | 11/22/2000 | 11/22/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 09:00:27. Contact: ###-####.
|