Final | 3/21/2001 | 3/22/2001 | 3/22/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 16:47:51. Contact: ###-####.
|
Final | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 10:43:13. Contact: ###-####.KEY PAD ON DOOR 0474 ENTER need 1/4" rise per foot on single wall..screws in dryer vent 3/20/2001 2:59:18 PM
|
Pressure Test | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 13:17:08. Contact: ###-####.
|
Rough-in | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 13:16:31. Contact: ###-####.
|