Rough-in | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 10:37:49. Contact: .
|
Final | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 09:55:23. Contact: ###-####. no f/p installed yet 11/21/2000 9:24:31 AM
|