Final | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 09:48:16. Contact: ###-####. sign occ card 3/13/2001 2:33:09 PM
|
Conference | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | PART |
Dave Lightfoot
|
|
|
An alum. ladder of required height to be permanently stored inside on site for access to roof top units. Per Tim H.
|
Final | 1/12/2001 | 1/12/2001 | 1/12/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:26:35. Contact: ###-####. sign temp occ still r.t.u. to complete 1/12/2001 1:51:16 PM
|
Final | 1/9/2001 | 1/11/2001 | 1/11/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/09/2001 at 12:58:23. Contact: ###-####. no roof top units 1/11/2001 11:47:57 AM
|
Rough-in | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | NR |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 12:36:23. Contact: ###-####.
|