Final | 1/29/2001 | 1/30/2001 | 1/30/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 18:08:41. Contact: ###-####.
|
Final | 1/26/2001 | 1/26/2001 | 1/26/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 09:31:46. Contact: ###-####. C/N posted... Contr called. 1/26/2001 2:22:58 PM
|
Rough-in | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 09:38:31. Contact: ###-####.
|
Rough-in | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PART |
Dixie Fellows
|
|
|
greg-- ###-#### r/i gas ok..r/i fail.. 11/27/2000 2:16:20 PM
|