Final | 9/5/2002 | 9/6/2002 | 9/6/2002 | P | CANC |
Dixie Fellows
|
|
|
DAVID THIS PERMIT IS EXP THIE FIRST TIME AROUND FAILED COULD YOU PLEASE LOOK IN TO THIS ? I PUT IT IN FOR A FINAL..DARLA CHERIE ###-#### cancelled by april 9/6/2002 2:14:44 PM
|
Final | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 09:49:43. Contact: ###-####. everything ok but for the gas cook top 12/5/2001 3:21:50 PM
|
Pressure Test | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 15:11:33. Contact: ###-####. main floor fire place xet wood to gas 8/6/2001 11:10:35 AM
|
Pressure Test | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 16:19:48. Contact: ###-####.c/n posted only 12 psi at guage. 8/2/2001 9:32:56 AM
|
Pressure Test | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/13/2001 at 07:42:26. Contact: ###-####.
|
Rough-in | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/13/2001 at 07:42:11. Contact: ###-####. 7/13/2001 2:03:17 PM
|
Pressure Test | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 12:04:08. Contact: ###-####. pool heater 1/20/2002 11:16:51 AM
|
Pressure Test | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 08:29:02. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/15/2001 at 10:00:23.
|
Pressure Test | 1/31/2001 | 2/1/2001 | 2/1/2001 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 14:39:00. Contact: ###-####.
|