Final | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 1/15/2002 12:07:43 PM meet at 9 am 1/15/2002 12:08:55 PM
|
Final | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | NR |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 16:46:29. Contact: .
|
Final | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | NR |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 1/15/2002 10:39:27 AM
|
Pressure Test | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 16:01:31. Contact: ###-####.
|