Final | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 09:23:08. Contact: ###-####.
|
Final | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | FAIL |
Alan Hauser
|
|
|
called contractor 4/6/2001 2:08:16 PM
|
Pressure Test | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 16:50:58. Contact: ###-####.
|
Rough-in | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 16:50:32. Contact: ###-####.
|
Pressure Test | 12/20/2000 | 12/20/2000 | 12/20/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 09:52:55. Contact: ###-####.
|
Rough-in | 12/20/2000 | 12/20/2000 | 12/20/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 09:52:28. Contact: ###-####. basement is totally unfinished. Scheduled C/N ...P/T fail, catwalk, seal cold air ret, fresh air Bsmnt. by a contractor via Hello! on 12/20/2000 at 09:52:28. Contact: ###-####. basement is totally unfinished. 12/20/2000 2:18:34 PM
|