Final | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 09:00:44. Contact: ###-####.
|
Pressure Test | 12/29/2000 | 12/29/2000 | 12/29/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 08:00:01. Contact: ###-####.
|
Pressure Test | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | NR |
Dixie Fellows
|
|
|
no number to call 12/28/2000 10:14:08 AM
|
Rough-in | 12/28/2000 | 12/28/2000 | 12/28/2000 | P | PART |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 12/28/2000 4:12:32 PM r/i ok...gas fail
|
Rough-in | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | NR |
Dixie Fellows
|
|
|
|