Final | 5/2/2001 | 5/3/2001 | 5/3/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 17:01:54. Contact: ###-####.
|
Final | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/11/2001 at 10:45:33. Contact: ###-####.
|
Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PASS |
Tony Young
|
|
|
Added by Inspector: 415 On 2/27/2001 3:13:58 PM pressure test
|
Pressure Test | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 14:25:15. Contact: ###-####.
|
Rough-in | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 14:24:33. Contact: ###-####.
|