Final | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 07:27:19. Contact: ###-####.
|
Pressure Test | 1/12/2001 | 1/12/2001 | 1/12/2001 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:09:15. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/12/2001 at 09:11:24.
|
Pressure Test | 1/12/2001 | 1/12/2001 | 1/12/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:14:26. Contact: ###-####. as late as possible ////////////// 1/12/2001 3:11:27 PM
|
Rough-in | 1/12/2001 | 1/12/2001 | 1/12/2001 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:08:50. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/12/2001 at 09:12:14.
|
Rough-in | 1/12/2001 | 1/12/2001 | 1/12/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:13:24. Contact: ###-####. as late as possible
|