Final | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 08:29:33. Contact: ###-####.
|
Pressure Test | 12/22/2000 | 12/26/2000 | 12/26/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 16:45:29. Contact: ###-####.
|
Rough-in | 12/22/2000 | 12/26/2000 | 12/26/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 16:45:06. Contact: ###-####.
|