Final | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 08:33:10. Contact: ###-####.
|
Final | 4/5/2001 | 4/5/2001 | 4/5/2001 | P | NR |
Alan Hauser
|
|
|
not ready, corrections not made at the two water heaters, $42 reinspection fee 4/5/2001 2:05:35 PM
|
Final | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | FAIL |
Alan Hauser
|
|
|
need shut off at both water heaters 4/4/2001 3:17:28 PM
|
Pressure Test | 12/18/2000 | 12/19/2000 | 12/19/2000 | A | PASS |
Russ Owen
|
|
|
###-#### Sherryok prior c/n 12/19/2000 11:02:56 AM
|
Pressure Test | 12/19/2000 | 12/19/2000 | 12/19/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 12/19/2000 12:08:00 PM
|