Final | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 08:55:16. Contact: ###-####.
|
Rough-in | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 09:08:36. Contact: ###-####.
|
Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Dave Lightfoot
|
|
|
PAT ###-#### RE-INSP R/I hydronics and gas test 8/14/2001 11:20:32 AM
|
Conference | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | CANC |
Dave Lightfoot
|
|
|
Scheduled by Inspector: 301 On 7/17/2001 1:27:15 PM bad permit no. 7/18/2001 10:15:33 AM
|
Rough-in | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 08:32:21. Contact: ###-####. job walk way 12/21/2000 11:12:07 AM
|