Final | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | FAIL |
Dixie Fellows
|
|
|
meet jeff at 8:15 fn no access into house 6/7/2001 10:47:02 AM
|
Final | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | PASS |
Dixie Fellows
|
|
|
meet jeff at 4:00 as per dixie
|
Final | 6/5/2001 | 6/6/2001 | 6/6/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 15:03:17. Contact: ###-####. will meet jeff thurs am 6/6/2001 4:40:29 PM
|
Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 | A | PART |
Dixie Fellows
|
|
|
###-#### do not cover ceiling around kitchen hood 1/2/2001 12:00:48 PM
|
Rough-in | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 14:14:12. Contact: ###-####. c/n posted 12/28/2000 10:38:42 AM
|
Rough-in | 12/27/2000 | 12/27/2000 | 12/27/2000 | P | NR |
Dixie Fellows
|
|
|
r/i kay ###-#### keith will call thurs for walkthrough 12/28/2000 12:30:44 PM
|