Final | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 08:49:43. Contact: ###-####.
|
Pressure Test | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 09:33:21. Contact: ###-####.
|
Rough-in | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 09:32:57. Contact: ###-####.
|