Final | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 07:43:42. Contact: ###-####.
|
Final | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 07:43:42. Contact: ###-####.
|
Pressure Test | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 3/27/2001 2:02:46 PM
|
Pressure Test | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 3/27/2001 2:02:46 PM
|
Rough-in | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 14:27:33. Contact: ###-####. RI ok, pressure test ok. 1/4/2001 11:59:16 AM
|
Rough-in | 12/28/2000 | 12/29/2000 | 12/29/2000 | P | FAIL |
Dixie Fellows
|
|
|
R/I SHANE ###-#### ALSO F/P INSP no 90' offset allowed in b-vent..gas test failed 12/29/2000 1:43:17 PM
|