Final | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 09:11:39. Contact: .
|
Rough-in | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | PART |
Tom Arcoraci
|
|
|
R/I DAN-- ###-#### needs fixed glazing over tub 1/4/2001 4:15:29 PM
|
Pressure Test | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 17:15:06. Contact: ###-####.
|
Rough-in | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 17:14:09. Contact: ###-####. bath exhaust to be 3' from open window 1/3/2001 10:13:35 AM
|