Final | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 10:27:16. Contact: ###-####.
|
Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/18/2001 at 15:41:18. Contact: ###-####.
|
Rough-in | 1/17/2001 | 1/18/2001 | 1/18/2001 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 16:22:45. Contact: ###-####. gas test fail...r/i ok 1/18/2001 12:02:51 PM
|