Final | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 11:39:33. Contact: ###-####... 2/13/2001 10:31:38 AM
|
Pressure Test | 1/8/2001 | 1/9/2001 | 1/8/2001 | A | CANC |
Tom Arcoraci
|
|
|
Disp set to [CANC] by a contractor via Hello! on 01/08/2001 at 10:50:54.
|
Rough-in | 1/8/2001 | 1/9/2001 | 1/8/2001 | A | CANC |
Tom Arcoraci
|
|
|
###-#### Disp set to [CANC] by a contractor via Hello! on 01/08/2001 at 10:50:10.
|
Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 10:52:02. Contact: ###-####. combustion air to be checked at final 1/8/2001 3:44:47 PM
|