Final | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:44:33. Contact: ###-####.
|
Final | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 08:19:41. Contact: ###-####. C/N...Fix leak in duct at range hood. Notified contr. 2/21/2001 3:21:52 PM
|
Pressure Test | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 14:58:53. Contact: ###-####.
|
Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 14:58:28. Contact: ###-####.
|