Final | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | NR |
Dave Lightfoot
|
|
|
Peggy ###-####
|
Final | 2/8/2001 | 2/8/2001 | 2/8/2001 | P | PASS |
Dave Lightfoot
|
|
|
###-#### sign occ card 2/8/2001 2:59:24 PM
|
Final | 2/6/2001 | 2/7/2001 | 2/7/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 15:19:14. Contact: ###-####. need hood permit 2/7/2001 2:47:02 PM
|
Rough-in | 1/17/2001 | 1/18/2001 | 1/18/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 16:53:04. Contact: ###-####. ok for ceiling cover 1/18/2001 2:36:26 PM
|
Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 17:59:18. Contact: ###-####.
|