Final | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 10:41:28. Contact: ###-####.
|
Final | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 08:57:55. Contact: ###-####. no address posted 3/12/2001 2:35:20 PM
|
Final | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | NR |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 09:34:49. Contact: ###-####.
|
Rough-in | 1/12/2001 | 1/16/2001 | 1/16/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 13:44:27. Contact: ###-####.
|
Rough-in | 1/12/2001 | 1/12/2001 | 1/12/2001 | A | FAIL |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 1/12/2001 11:44:56 AM seal seams on r/a and supply sharing space with b-vent..insulate all boots and plenums in attic 1/12/2001 12:16:44 PM
|