Final | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 11:53:51. Contact: ###-####.
|
Pressure Test | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 10:28:18. Contact: ###-####.
|
Pressure Test | 1/30/2001 | 1/31/2001 | 1/31/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 09:08:13. Contact: ###-####. pipe fire place 1/31/2001 3:07:16 PM
|
Rough-in | 1/30/2001 | 1/31/2001 | 1/31/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 09:07:32. Contact: ###-####.
|