Final | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 11:57:20. Contact: ###-####. fail by 411 2/22/2001 10:12:06 AM fail by 411 2/21/01 2/22/2001 10:12:37 AM
|
Final | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:48:58. Contact: ###-####.
|
Final | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | FAIL |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 2/21/2001 2:31:11 PM b-vent to be 10' from air intake...no 90' offsets allowed in b-vent
|
Final | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 14:23:42. Contact: ###-####...permit doesn't include boiler relocation 2/21/2001 9:00:07 AM
|
Pressure Test | 1/24/2001 | 1/25/2001 | 1/25/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 15:26:02. Contact: ###-####.
|