Final | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 16:24:25. Contact: ###-####. need hydronic permit 4/10/2001 10:45:21 AM
|
Final | 4/10/2001 | 4/10/2001 | 4/10/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 11:24:35. Contact: ###-####. sign occ card 4/10/2001 3:02:57 PM
|
Final | 3/19/2001 | 3/20/2001 | 3/20/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 11:03:27. Contact: ###-####. sign temp still need hydronicinspection 3/20/2001 11:26:56 AM
|