Final | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 13:13:22. Contact: ###-####.
|
Final | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | NR |
Alan Hauser
|
|
|
finish range exhaust 3/22/2001 3:42:25 PM
|
Pressure Test | 2/22/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 15:57:18. Contact: ###-####.
|
Rough-in | 2/22/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 15:56:54. Contact: ###-####.
|