Final | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 15:05:30. Contact: ###-####.
|
Final | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 10:41:14. Contact: ###-####. c/n posted 4/2/2001 2:32:39 PM
|
Rough-in | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 11:37:25. Contact: ###-####. Includes gas fireplace inspection. 2/15/2001 3:27:19 PM
|