Final | 4/2/2001 | 4/4/2001 | 4/4/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 13:07:08. Contact: ###-####. 4/4/2001 2:39:49 PM
|
Pressure Test | 2/23/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 2/23/2001 2:41:07 PM
|
Rough-in | 2/23/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/23/2001 at 10:30:29. Contact: ###-####.
|
Rough-in | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/16/2001 at 11:35:40. Contact: ###-####. not here today...411 2/21/2001 8:33:09 AM
|