Final | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PASS |
Dixie Fellows
|
|
|
jeff- ###-#### fn -reinsp
|
Final | 8/28/2001 | 8/29/2001 | 8/29/2001 | P | FAIL |
Dave Lightfoot
|
|
|
AL ###-#### c/n posted 8/29/2001 2:27:36 PM
|
MEC-Aging Inspection | 8/6/2001 | 8/6/2001 | 8/6/2001 | | NR |
Dave Lightfoot
|
|
|
|
Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:21:39. Contact: .
bath vents, pressure test, radiant floor ok 5/2/2001 10:18:44 AM
|
Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 16:21:39. Contact: .
bath vents, pressure test, radiant floor ok 5/2/2001 10:18:44 AM
|
Rough-in | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | CANC |
Tony Young
|
|
|
for radiant floor tubes, gas pipe & bath vents--al ###-#### r/i
|
Rough-in | 2/21/2001 | 2/21/2001 | 2/21/2001 | A | PASS |
Tony Young
|
|
|
###-#### ASAP this was schedule on 2-20-01to be done but Alan said he could not find the construction site!!!! They have mudd coming at 8:30a.m.
|
Rough-in | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | CANC |
Alan Hauser
|
|
|
couldn't find address or any work 2/20/2001 12:34:53 PM
|