Final | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | PASS |
Dave Lightfoot
|
|
|
###-#### no card on site 3/7/2001 1:53:01 PM
|
Final | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | FAIL |
Dave Lightfoot
|
|
|
###-#### not ready 3/6/2001 9:27:29 AM
|
Final | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | NR |
Dave Lightfoot
|
|
|
joann ###-####
|
Rough-in | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 07:47:43. Contact: ###-####.
|
Rough-in | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 17:11:30. Contact: ###-####. c/n posted 2/28/2001 11:34:51 AM
|
Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 11:02:25. Contact: ###-####. c/n posted 2/28/2001 4:06:51 PM
|
Pressure Test | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | FAIL |
Dave Lightfoot
|
|
|
|
Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### work is covered with insulation 2/27/2001 2:57:19 PM
|
Pressure Test | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Greg ###-#### covered with insulation 2/23/2001 11:16:08 AM
|
Rough-in | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Greg ###-#### covered with insulation 2/23/2001 11:15:32 AM
|