Final | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 07:51:29. Contact: ###-####...exhaust vents ok 5/1/2001 5:53:37 PM
|
Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 13:39:55. Contact: ###-####.
|
Pressure Test | 2/20/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 15:38:49. Contact: ###-####. remove regulator from water. 2/21/2001 3:48:05 PM to be check at rough in . gas p/t ok 2/21/2001 3:48:41 PM
|