Final | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 12:00:59. Contact: ###-####.
|
Final | 3/29/2001 | 3/29/2001 | 3/29/2001 | P | FAIL |
Alan Hauser
|
|
|
need 6" clearance at furnace connector to flue 3/29/2001 3:01:29 PM
|
Pressure Test | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 10:49:29. Contact: ###-####.
|
Rough-in | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 10:48:54. Contact: ###-####.
|