Final | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PASS |
Dixie Fellows
|
|
|
per dixie for fn
|
Pressure Test | 7/11/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 07:21:56. Contact: ###-####.
|
Pressure Test | 7/10/2001 | 7/10/2001 | 7/10/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 07:15:23. Contact: ###-####. size pipe per plan 7/10/2001 10:41:48 AM
|
Pressure Test | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 08:55:35. Contact: ###-####. need 60 psi test 7/9/2001 1:18:02 PM
|
MEC-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 | | FAIL |
Dave Lightfoot
|
|
|
no history 6/4/2001 8:18:30 AM
|