Final | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 09:24:38. Contact: ###-####.
|
Final | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | FAIL |
Alan Hauser
|
|
|
locked 4/27/2001 3:29:56 PM
|
Pressure Test | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 16:02:40. Contact: ###-####.
|
Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 16:02:23. Contact: ###-####.
|