Final | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 10:44:06. Contact: ###-####.
|
Pressure Test | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 07:49:34. Contact: ###-####.
|
Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 07:49:10. Contact: ###-####.
|