Final | 4/10/2001 | 4/11/2001 | 4/11/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 14:09:55. Contact: ###-####. call first sign occ card 4/11/2001 11:57:21 AM
|
Final | 4/3/2001 | 4/4/2001 | 4/4/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 16:56:13. Contact: ###-####. install type 2 hood at dishwasher 4/4/2001 4:24:26 PM
|
Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 16:29:09. Contact: ###-####.
|
Rough-in | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 10:19:45. Contact: ###-####.
|