Final | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 08:33:01. Contact: ###-####.
|
Final | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | FAIL |
Alan Hauser
|
|
|
fix overflow drain 4/19/2001 10:33:44 AM
|
Final | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 12:56:53. Contact: ###-####....called and left message..nobody called me back 4/18/2001 11:00:35 AM
|
Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 13:31:54. Contact: ###-####.
|