Final | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | PASS |
Alan Hauser
|
|
|
bj ###-####
|
MEC-Aging Inspection | 11/19/2001 | 11/19/2001 | 11/19/2001 | | NR |
Dave Lightfoot
|
|
|
|
MEC-Aging Inspection | 8/17/2001 | 8/17/2001 | 8/17/2001 | | FAIL |
Dave Lightfoot
|
|
|
no reinspection 8/17/2001 8:24:07 AM
|
Rough-in | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PART |
Dave Lightfoot
|
|
|
###-#### need shoe nail plates on gas pipe all lower units 5/18/2001 12:22:22 PM
|
Pressure Test | 5/16/2001 | 5/17/2001 | 5/17/2001 | P | PASS |
Dave Lightfoot
|
|
|
|
MEC-Aging Inspection | 5/15/2001 | 5/15/2001 | 5/15/2001 | | CANC |
Dave Lightfoot
|
|
|
This is an aging activity
|
Pressure Test | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-#### test failed on back side of bldg 3/7/2001 9:33:44 AM
|