Final | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 08:35:10. Contact: ###-####. code is GBT to get in 5/21/2001 1:00:22 PM
|
Pressure Test | 3/23/2001 | 3/23/2001 | 3/23/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 08:12:17. Contact: ###-####.
|
Pressure Test | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 16:47:27. Contact: ###-####.
|
Rough-in | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 16:47:53. Contact: ###-####.
|