Final | 5/14/2001 | 5/15/2001 | 5/15/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 15:37:03. Contact: ###-####.
|
Pressure Test | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 18:07:44. Contact: ###-####.
|
Rough-in | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 18:07:32. Contact: ###-####.
|