Final | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 12:57:25. Contact: ###-####.
|
Final | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 14:20:36. Contact: ###-####. c/n posted 3/27/2001 11:40:31 AM
|
Rough-in | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | PART |
Dave Lightfoot
|
|
|
###-#### r.t.u. plenums ok through ceiling 3/14/2001 2:35:30 PM
|