Final | 9/14/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/14/2001 at 15:05:30. Contact: ###-####.
|
Pressure Test | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | PART |
Alan Hauser
|
|
|
###-#### pool heater underground piping ok, all that was looked at 8/8/2001 3:10:09 PM
|
MEC-Aging Inspection | 6/26/2001 | 6/26/2001 | 6/26/2001 | | NR |
Dave Lightfoot
|
|
|
|
Pressure Test | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 11:17:44. Contact: ###-####.
|
Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 11:17:20. Contact: ###-####.
|