Final | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 14:33:32. Contact: ###-####.
|
Rough-in | 3/30/2001 | 4/2/2001 | 4/2/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 13:56:51. Contact: ###-####.
|
Rough-in | 3/29/2001 | 3/29/2001 | 3/29/2001 | P | FAIL |
Alan Hauser
|
|
|
corrections on duct, pt ok 3/29/2001 4:50:14 PM
|