MEC-Aging Inspection | 8/28/2001 | 8/28/2001 | 8/28/2001 | | PASS |
Dave Lightfoot
|
|
|
|
Final | 5/29/2001 | 5/29/2001 | 5/29/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 10:08:07. Contact: ###-####.
|
Final | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 11:06:07. Contact: ###-####. c/n posted 5/23/2001 3:55:55 PM
|
Pressure Test | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 09:12:17. Contact: ###-####.
|
Rough-in | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 09:11:49. Contact: ###-####.seal return air in floor joist. 3/26/2001 3:06:57 PM
|