Final | 5/11/2001 | 5/14/2001 | 5/14/2001 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/11/2001 at 13:35:59. Contact: ###-####.
|
Final | 5/14/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 5/14/2001 9:02:21 AM
|
Rough-in | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 15:27:19. Contact: ###-####.
|
Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 16:40:30. Contact: ###-####. clearance problems 3/27/2001 9:46:52 AM
|
Rough-in | 3/21/2001 | 3/22/2001 | 3/22/2001 | A | FAIL |
Dixie Fellows
|
|
|
###-####
|